Cove Road I – Construction Progress
The Original Cove Road version of the CB&Q in Wyoming was under construction from 2003 until 2010. The slide show above runs through the entire build until the layout was dismantled.
For a more detailed look at construction through the life of the layout, the buttons below take you through the build progress on a year-by-year basis, with captions on the photos that explain what was going on at the time. Buttons at the bottom of each page will bring you back here or on to the next year.